Project co-ordination: Acting as a key link between the project and the shareholders (by transmitting up to date reports on project progress).
Business Management.
Maximizing production to its potentials
First, we propose all possible and industry related products and bi-products to the client
Then, from the proposed design we identify the machines to fulfill all products range to be manufactured
AI Group creates optimum design and construction road map for any project. Our experience, which goes beyond just mechanical and electrical design and contracting, combines the basics of design with the identification of opportunities as well as using creative hands-on solutions to production problems and enhancements.
We provide a variety of services which include:
Project Management:
Scheduling
Coordination of all project tasks
Procurement assistance
Mechanical and electrical request for bids
Subcontractor selection and management
Electrical Design and Controls:
Process control
Motor control panels and PLC panels
Single line diagrams
I/O layouts
PLC programming
HMI design and programming
Peripheral equipment interfacing
Design Engineering:
Concept development
Loading studies
General arrangements drawings
Equipment design
Foundation design
Design, Build and Install:
Mechanical and electrical equipment
Steel structures
Foundations
Site Services:
Field management
Equipment check-out
Systems start-up
Special Services:
Site selection
Market research
AI Group considers the following activities are essential and must be controlled in the industrial projects to ensure successful launch and operations:-
1.0 – Plant Equipment. / Process equipment – ( Program includes engineering, technical specification & financial aspects follow up)
1.1 – Equipment sheet flow / Design process flow chart
1.2 – Equipment Specification
1.3 – Equipment Allocation / source.
1.4 – Bill of quantities
1.5 – Equipment tendering / (invitation to tender)
1.6 – Formal acceptance of tender.
1.7 – Contract documents / Contract agreement.
1.8 – Equipment ready for shipping
1.9 – Port / Site inspection – Equipment on site.
1.10 – Physical completion of Equipment installation.
1.11 – Plant and equipment commissioned and proved.
1.12 – Payment terms & bank guarantee related to the project.
1.13 – Laboratory Equipment.
1.14 – Equipment Specification.
1.15 – Equipment Allocation / Source.
1.16 – Equipment tendering
1.17 – Equipment installation./ commissioning .etc.
1.18 – Non – process Equipment / Rm. & finished product handling equipment.
3.0 – Building and Structures.
3.1 – Approximate sizes & Type of Construction.
3.2 – Design work etc.
4.0 – Raw materials.
4.1 – Rm chemical analysis, according to product chemical formulation
4.2 – Rm specification confirmation. .
4.3 – Rm source allocation.
4.4 – Raw materials ordering schedule / inventory control etc.
5.0 – Utilities.
5.1 – Electric generator
5.2 – Water Well
5.3 – Primary water treatment (filtration, pH, and hardness control etc.)
5.4- Fuel / thermal oil.6.0 – Marketing Strategy.
6.1 – Product technical catalogues
6.2 – Product market strategies
6.3 – Product for export markets
6.4 – Product development.
6.5 – Market the products in the local market
6.6 – Market the products in Canada, Europe7.0 – Research and development
7.1 – Setting in house factory research and development
7.2 – Link in house R&D with international centres so as the operation is up to date with the chemical manufacturing technology
8.0 – Recruiting
8.1 – Recruiting all the staff required for the operation from the professionals to the workers.